INTERA
  • Services et industries
    • Prestations de service
      • Environnement
      • Ressources en eau et approvisionnement
      • Génie côtier
      • Déchet radioactif
    • les industries
      • Exploitation minière
      • Services d’eau
      • Pétrole et gaz
      • Légale
      • Puissance et énergie
      • Gouvernement
      • Brownfields
      • Déchets solides
  • Accueil Carrières
  • Projets
  • Société
    • À propos d’INTERA
    • Notre promesse
    • Direction
    • Accueil Carrières
    • Emplacements
    • Médias
  • FR
    • EN (Anglais)
    • ES (Espagnol)
    • DE (Allemand)
INTERA

INTERA

Environmental and Water Resource Consulting Firm

  • Services et industries
        • Prestations de service
          • Environnement
          • Ressources en eau et approvisionnement
          • Génie côtier
          • Déchet radioactif
        • les industries
          • Exploitation minière
          • Services d’eau
          • Pétrole et gaz
          • Légale
          • Puissance et énergie
          • Gouvernement
          • Brownfields
          • Déchets solides
  • Accueil Carrières
  • Projets
  • Société
    • À propos d’INTERA
    • Notre promesse
    • Direction
    • Accueil Carrières
    • Emplacements
    • Médias
  • FR
    • EN (Anglais)
    • ES (Espagnol)
    • DE (Allemand)
March 18, 2021 · (Updated: January 19, 2022)
Projets

Depuis 1974, INTERA a réalisé des milliers de projects à l’appui des objectifs de nos clients aux États-Unis et dans le monde

Real-Time Groundwater Monitoring and Data Management System 
Water Resources, Government

Real-Time Groundwater Monitoring and Data Management System 

Environmental, Health, and Safety Audits at Semiconductor Manufacturing Facilities
Manufacturing

Environmental, Health, and Safety Audits at Semiconductor Manufacturing Fac…

Permitting of a Municipal Solid Waste Disposal and Recycling Facility
Solid Waste

Permitting of a Municipal Solid Waste Disposal and Recycling Facility

Air Quality Permitting for a Semiconductor Fabrication Facility
Manufacturing

Air Quality Permitting for a Semiconductor Fabrication Facility

Permitting, Design, and Installation of Injection and Monitoring Wells for Aquifer Replenishment
Water Resources

Permitting, Design, and Installation of Injection and Monitoring Wells for …

Site Assessment and Oversight of Decommissioning Activities at a Semiconductor Manufacturing Facility
Manufacturing

Site Assessment and Oversight of Decommissioning Activities at a Semiconduc…

Delineating the Horizontal CO₂ Plume Extent at Complex, Heterogenous Storage Sites
Carbon Storage

Delineating the Horizontal CO₂ Plume Extent at Complex, Heterogenous Stor…

Permit Applications for Class I Injection Wells
Environmental, Water Resources, Carbon Storage, Oil and Gas

Permit Applications for Class I Injection Wells

Hydrogeological and Geochemical Characterization for Colombian Copper-Gold Project
Mining

Hydrogeological and Geochemical Characterization for Colombian Copper-Gold …

Load More

Footer

Nous contacter

INTERA, HQ
9600 Great Hills Trail
Suite 300W
Austin, TX 78759
+1 (512) 425-2000

Apprendre encore plus

  • Blog
  • Nouvelles
  • Événements

Information

  • Termes et conditions
  • Politique de confidentialité
  • Plan du site
  • LinkedIn
  • Twitter

Obtenir la dernière!

Je suis intéressé à recevoir des nouvelles et du contenu de leadership éclairé d’INTERA.

  • This field is for validation purposes and should be left unchanged.

© INTERA 2021 Développé par Gloss